Design-Build project to improve physical security measures with the Bureau of Reclamation for Lahontan Dam. Fabrication and installation of materials to provide (2) K12 rated active vehicle barrier systems on the north and south ends to protect the crest of Lahontan Dam and spillway structure from unauthorized vehicle encroachment. Work included excavation, concrete, low voltage electrical, and asphalt.